• SEESUO has launched a data center optimization and expansion solution. The project focuses on designing and implementing efficient and scalable data center infrastructure to meet the ever-changing needs of modern enterprises. With the increasing demand for data processing and the urgent need for seamless connectivity, the solution aims to optimize existing resources, improve processing capabilities and support high-speed data transmission. By upgrading the network architecture, improving energy efficiency and integrating intelligent management systems. The computer room optimization project can provide a reliable foundation for the expansion of business operations, while reducing operating costs and ensuring future scalability.
    Project consultation
SOLUTION
网络拓图
SOLUTION ADVANTAGE
  • Improve performance and efficiency
    The upgraded computer room supports high-speed transmission switches and fiber optic equipment, which can significantly optimize resource utilization and greatly improve the processing capacity and data transmission efficiency of the data center.
  • Reduce operating costs
    Optimize energy usage and reduce PUE (Power Usage Effectiveness) values, thereby significantly reducing long-term power consumption and cooling costs.
  • Intelligent management
    The introduced DCIM system and AI optimization can monitor the operating status of equipment in real time, perform predictive maintenance, reduce failure rates and improve operation and maintenance efficiency.
  • Enhance scalability
    The modular design and distributed storage system support on-demand expansion without large-scale transformation, which not only meets current needs but also provides ample space for future growth.
TECHNICAL POINTS
  • Network architecture upgrade
    Use switches that support 100G, 400G, or even higher bandwidth, gradually phase out traditional equipment, and use SDN network architecture concepts.
  • Optimization of fiber optic infrastructure
    It uses low-loss single-mode optical fiber and upgrades to MPO/MTP high-speed optical fiber connectors to support high-density deployment.
  • Elastic and scalable design
    Build modular data centers and quickly expand capacity through prefabricated modules. Then use virtualization to improve server utilization.
  • Network equipment upgrade
    Based on the network bandwidth utilization assessment results, upgrade network equipment or increase network export bandwidth.
  • Optimization of cabinet and equipment layout
    Replan the cabinet layout to improve the space utilization of cabinets and equipment, and ensure the space and heat dissipation requirements between equipment.
  • Intelligent operation and maintenance
    Deploy a DCIM (data center infrastructure management) system to monitor the operating status of the computer room in real time, optimize resource allocation, and perform predictive maintenance of equipment.
RELEVANT PRODUCTS
  • Data Center Network Upgrade

    Performance evaluation and requirements analysis:The SEESUO team held a project discussion meeting. Comprehensively evaluate the performance of the existing data center and identify bottlenecks, including network traffic, storage utilization, processing power, and energy efficiency. Combined with business growth forecasts, determine capacity expansion needs, such as whether to increase bandwidth, expand storage, or improve computing power.

    Hardware optimization and expansion:According to the discussion at the meeting, the technicians replaced the cabinet hardware offline and optimized the configuration. The equipment layout adopted a modular design according to the technical method to improve space utilization, and upgraded the power cooling system and network equipment to enhance the heat dissipation effect and network stability and redundancy.

    Software and system optimization:After the hardware upgrade, the technical team further optimized and updated the computer room system and made new adaptations. By using virtualization technology to integrate server resources and considering the introduction of cloud computing platforms, while regularly updating the operating system and software to optimize configuration, efficient resource utilization, security, stability and elastic expansion can be achieved.

    Learn more
OUR CASE
OUR TEAM
SEESUO combines professional knowledge with innovation to provide tailored technical support and advanced solutions for clients, meeting their needs and ensuring precision in network design, system optimization, and troubleshooting. The technical team at SEESUO consistently stays at the forefront of technology.
  • Computer room optimization and expansion is a complex task involving multiple aspects, which requires comprehensive consideration of multiple factors such as hardware, software, network, energy efficiency and security
Performance evaluation and requirements analysis
The SEESUO team held a project discussion meeting. Comprehensively evaluate the performance of the existing data center and identify bottlenecks, including network traffic, storage utilization, processing power, and energy efficiency. Combined with business growth forecasts, determine capacity expansion needs, such as whether to increase bandwidth, expand storage, or improve computing power.

Hardware optimization and expansion
According to the discussion at the meeting, the technicians replaced the cabinet hardware offline and optimized the configuration. The equipment layout adopted a modular design according to the technical method to improve space utilization, and upgraded the power cooling system and network equipment to enhance the heat dissipation effect and network stability and redundancy.

Software and system optimization
After the hardware upgrade, the technical team further optimized and updated the computer room system and made new adaptations. By using virtualization technology to integrate server resources and considering the introduction of cloud computing platforms, while regularly updating the operating system and software to optimize configuration, efficient resource utilization, security, stability and elastic expansion can be achieved.

Implementation and Monitoring
According to the established optimization and expansion plan, the technical team will implement various tasks in stages, and conduct system debugging and testing after each stage to ensure the stable operation of the system. At the same time, the team will deploy the DCIM (Data Center Infrastructure Management) system to monitor the operation status of the computer room in real time, and continuously optimize and adjust the system configuration based on the monitoring results to achieve long-term stable operation and performance improvement.

CONSULTATION PROCESS
01
Demand consultation
Describe business needs and submit demand consultation
02
Initial communication
Answer questions about needs, align core demands, and determine cooperation intentions
03
Solution Exchange
Conduct online or offline discussions on relevant plans
04
Business Process
After the plan is finalized, the business process begins
TECHNICAL SUPPORT
Get solutions or consultation from the technical team.
RECOMMENDED ARTICLE